Skip to content
Garment Export House

Garment Export House

Learn with us

  • Textile
  • Quality Control
  • Production Management
  • Toggle search form
  • Why You Need IE Department in a Garment Factory? Uncategorized
  • Export Promotion Councils In India (under Textile Ministry) Uncategorized
  • What is AQL in Garment Industry? Quality Control
  • Difference Between CMT and FOB in Garment Manufacturing Uncategorized
  • Quality Control vs. Quality Assurance in the Garment Supply Chain Quality Control
  • Full Form of BOM in Garment Industry Uncategorized
  • Lisa Donohue Appointed to Gap Inc. Board of Directors Uncategorized
  • Functions of the Sewing Department in a Garment Factory Industrial Engineering

What is PCD in Garment Industry?

Posted on September 15, 2021July 10, 2026 By Admin No Comments on What is PCD in Garment Industry?

In garment production, PCD stands for Planned Cut Date. The date at which the bulk fabric cutting is planned to start.

Merchants or Planning department prepare the time and action calendar for each order they received from buyer. They need to share some information with buyers like the starting dates of key processes. Cut planned date (PCD) is one such key date in the Time and Action calendar that need to share with the buyer. 


PCD date


Even internal departments should be informed in advance about PCD of the specific orders.

Based on PCD, factories plan their activities related to other orders and plan material sourcing for each order. 

The object is to meet buyer’s shipping date. Once PCD is planned, the pre-production tasks and post- production are planned accordingly. Planning of PCD date is scheduled by planner (production manager) looking into the ex-factory date and factory capacity for the specific date. But final date of the PCD is rediscussed during the preproduction meeting and reconfirmed by all the concerned team, looking into the fabric availability, availability of the cutting room capacity and need of production start. 

Author

  • Admin
    Admin

    Admin user

Uncategorized Tags:Full Form, Production Planning

Post navigation

Previous Post: What is AQL (Acceptable Quality Level)?
Next Post: Full form of CMT in Garment Manufacturing Supply Chain

Related Posts

  • Lectra and Gerber boost fashion ecosystem productivity with patternmaking solution interoperability Uncategorized
  • Does branded clothing companies use new fabrics? Uncategorized
  • Garment manufacturers in the world | geh list Uncategorized
  • India: 41% increase in exports in textile sector in April-Dec 2021 compared to Apr-Dec 2020 Uncategorized
  • What is GPQ in garment quality control? Uncategorized
  • Double Cloth and It Construction Method Uncategorized

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Latest Posts

  • 20 Types of Fashion Accessories: A Complete Guide
  • Top Garment Buyers in Bangladesh
  • Top 20 Garment Export Houses in India
  • Quality Control vs. Quality Assurance in the Garment Supply Chain
  • How a Custom Clothing Manufacturer Brings Your Designs to Life

  • Responsibilities of a General Manager – Industrial Engineering (Garment Manufacturing) Uncategorized
  • What is UBT in Sewing Machine Categories for Garment Manufacturing Uncategorized
  • Does branded clothing companies use new fabrics? Uncategorized
  • Functions of the Cutting Department in a Garment Industry Uncategorized
  • What is the Full Form of PO in Garment Business? Uncategorized
  • 37th IAF World Fashion Convention Will be Held in November 2022 in Bangladesh Uncategorized
  • 10 Common Apparel Wash Care Instructions and Their Meaning Uncategorized
  • Textile industry update – India will be getting 7 mega textile parks Uncategorized
  • Directory

Disclaimer

Copyright © 2026 ocs.hostingersite.com.

Powered by PressBook News WordPress theme